Reinforcement of existing structures
Deteriorated glue laminated tudor arch amputation
Failed tension member (Bottom Chord) - Modified bow string truss
Structural shoring services
Epoxy injection and re-lamination
Field Inspection Services
Furnish & install glue laminated structures

Project J R Cigar Project Marcal Paper Project Howard Johnson's

 

Project: Howard Johnson's

 

 
Picture 6- Howard Johnson’s- Greensboro , NC
- New 3/4” steel lags were installed on existing glue laminated beam to repair checking and delamination and strengthen beam.

 
   
 
Picture 7- Newburg School- Newburgh , NY
- Tudor Arches were reinforced by adding addition laminations to the bottom radius of the existing arch. These laminations were shored , lag bolted and epoxy injected into place. The addition of these laminations helped to build a deeper arch.

 
   
 
Picture 8- Newburgh School- Newburgh , NY
- Pneumatic equipment is often used to install long lag bolts. These lag bolts work in conjunction with epoxy injection to field laminated new structural sections to existing structural sections.

 
   