Project:
Howard Johnson's
|
|
|
Picture 6- Howard Johnsons- Greensboro , NC
- New 3/4 steel lags were installed on existing
glue laminated beam to repair checking and delamination
and strengthen beam.
|
|
|
|
|
|
Picture 7- Newburg School- Newburgh , NY
- Tudor Arches were reinforced by adding addition laminations
to the bottom radius of the existing arch. These laminations
were shored , lag bolted and epoxy injected into place.
The addition of these laminations helped to build a deeper
arch.
|
|
|
|
|
|
Picture 8- Newburgh School- Newburgh , NY
- Pneumatic equipment is often used to install long lag
bolts. These lag bolts work in conjunction with epoxy
injection to field laminated new structural sections to
existing structural sections.
|
|
|
|